Meta rethinks its 2030 net zero goal and offers no new timeline
Meta's 2026 sustainability report puts the 2030 net zero timeline under review with no replacement date; 2025 net emissions rose 45% to 11.8 million tonnes.

Meta’s 2026 sustainability report, published on November 19, puts the company’s 2030 net zero deadline under review and does not set a replacement date. On page 5 it says it is “re-evaluating our timelines, sequencing, and interim milestones — including the 2030 timeframe for our net zero emissions goal and our near-term intensity targets”, while page 8’s “Our Goals” section still prints “Achieve net zero emissions across our value chain in 2030”. The number that is not in dispute: 11.8 million tonnes of CO2e in net emissions for 2025, up 45% from 2024.
Key points
- The report keeps the 2030 wording in its goals table while the leadership letter says the timeframe is under review. No new date is given, only a promise to “share where this work lands.”
- Net emissions rose from 5.74 million tonnes in 2021 to 11.82 million tonnes in 2025, a 2.06x increase. Scope 3 is 99% of the total, and capital goods alone account for 8.73 million tonnes, or 73%.
- Data center Scope 1 and Scope 2 emissions went from 15,257 to 19,073 tonnes. The growth sits upstream, in servers and construction, not in the fuel and power the buildings burn themselves.
The facts
The exact wording matters here, because it is neither a cancellation nor business as usual. Meta is re-evaluating its timelines, its sequencing and its interim milestones, and the sentence names two things in scope: the 2030 timeframe for the net zero goal and “our near-term intensity targets.” The report does not say which intensity targets those are, and it does not attach a new year to anything.
What stays is just as important to read. Page 8 still lists net zero by 2030 and water positive by 2030 as long-term goals, plus four climate and energy supporting targets: cut Scope 1 and Scope 2 emissions 42% by the end of 2031 from a 2021 baseline, keep Scope 3 emissions from exceeding the 2021 baseline by the end of 2031, match 100% of annual electricity use with clean and renewable energy, and get two-thirds of suppliers to set science-aligned targets by the end of 2026. The methodology appendix also states that “we currently maintain a Science Based Targets initiative (SBTi)-validated emissions reduction target.” On paper, what has been loosened is the deadline, not every goal.
A Meta spokesperson told reporters: “We remain committed to net zero, but are re-evaluating the 2030 timeline and interim milestone. We’ll continue investing in emissions reductions and reporting our progress annually.” That is the company’s only public explanation so far, and it comes without a date for when the review will finish.
The report blames conditions outside the company: grid interconnection queues that run for years, permitting timelines that have not shortened, transmission buildout that lags demand, and supply chains for low-carbon fuels and materials that are still maturing. The document never mentions the Paris Agreement and does not discuss changes in US federal climate policy, which is a notable silence given the context in which these corporate pledges were made at the start of the decade.
One change sits outside the report. Meta left RE100 in July; TechCrunch reported that the split followed the initiative’s stricter renewable-energy reporting requirements. The phrase RE100 no longer appears anywhere in the 2026 report, although the 100% clean energy matching claim does.
What the numbers cover
Reading Meta’s emissions requires picking an accounting basis first, because the same year can be read three ways.
| Metric | 2024 | 2025 | Change |
|---|---|---|---|
| Net emissions (market-based, with credits) | 8.16 Mt | 11.82 Mt | +45% |
| Total emissions (location-based) | 15.63 Mt | 21.75 Mt | +39% |
| Scope 1 | 47,242 t | 33,555 t | -29% |
| Scope 2 (market-based) | 7,876 t | 10,861 t | +38% |
| Scope 3 | 8.15 Mt | 11.86 Mt | +45% |
| of which capital goods (Category 2) | 5.52 Mt | 8.73 Mt | +58% |
| Data center Scope 1 and Scope 2 | 15,257 t | 19,073 t | +25% |
| Electricity consumption | 18.4 TWh | 24.8 TWh | +35% |
| GHG intensity per MWh | 0.45 t | 0.48 t | +7% |
The 45% is the market-based net figure, after clean energy instruments and 80,000 tonnes of carbon credits. The location-based number counts what the grid actually emitted, rises about 39% to 21.75 million tonnes, and is the one Ars Technica compared to US states: roughly Idaho’s entire emissions, and more than Hawaii, Maine, South Dakota or New Hampshire, the outlet said. Both numbers are correct and answer different questions. Market-based tells you what Meta bought; location-based tells you how much more electricity the local grid had to supply.
The four-year doubling starts from 2021. Net emissions were 5.74 Mt in 2021, 8.46 Mt in 2022, 7.45 Mt in 2023, 8.16 Mt in 2024 and 11.82 Mt in 2025, with only 2023 lower than the year before, for a cumulative increase of about 106%.
TechCrunch’s article says data center emissions “increased more than 12 times” between 2024 and 2025. That multiple cannot be reproduced from the report’s data tables: the per-site table puts data centers at 15,257 to 19,073 tonnes, and their electricity use at 18.1 to 24.5 TWh. No published line comes close to a 12x jump, so we have not used the figure as a fact; it is recorded here as the outlet’s claim.
Cross-year comparisons also need care. A footnote says Meta restated its 2023 and 2024 Scope 1 and Scope 2 market-based values after discovering errors, and 2024 Scope 2 moved from 1,358 tonnes in the previous report to 7,876 tonnes in this one. Comparing figures pulled from different editions can invent a trend that never happened.
Background
Meta set its two 2030 goals at the start of the decade, on the assumption of steady growth, falling clean energy costs and a broader system that would move at the pace the company planned for. The AI buildout changed the growth curve: servers, buildings and power now have to be locked in years ahead, and emissions followed.
The spending behind that curve is real. Meta priced $15 billion of senior notes on November 3 to fund AI infrastructure, as we reported at the time. On the energy side, the company says it has contracted more than 30 GW of clean and renewable power, including more than 10 GW signed in 2025 alone, while conceding that interconnection and transmission cannot keep up with its electricity demand.
Hyperion, the Louisiana campus, is where the curve is steepest. CNET reports that the site is expected to deliver 2 GW of capacity when it comes online in 2030. It is not running yet, and TechCrunch describes Meta’s natural gas bet there as running into the billions, with gas capable of having a climate impact comparable to coal once leaky infrastructure is counted.
Resistance is growing too. Data centers became a midterm election issue this year, with about $198 billion of projects delayed or shelved in the first half because of community opposition (our earlier entry), and at least 38 proposals rejected across 13 states. Meta needs land and power in those same places while telling investors that progress has fallen behind its goals.
What others say
TechCrunch’s headline is that Meta threw out its net zero goal and that its competitors should be furious. The argument is about competition rather than carbon: voluntary pledges carry little direct financial cost, so the first company to step back shifts the pressure onto peers that are still holding, while public hostility to AI and data centers builds toward regulation that would hit everyone. That is an argument, not a finding.
Ars Technica supplies the horizontal comparison. On a location-based basis, Meta’s total emissions rose nearly 40% between 2024 and 2025, the largest percentage increase among the four major US tech companies, and the outlet notes that Amazon, Google and Microsoft have all stuck by their original goals so far. CNET called the report disappointing but not surprising, and recalled that a Microsoft executive said in 2023 that the company’s net zero goal predated the AI explosion.
Meta’s own account is brief: still committed, still re-evaluating the timeline. We found no public comment on the report from the SBTi, from RE100 or from regulators.
A second comparison comes from Google. Its 2025 environmental report still commits to net zero across operations and value chain by 2030, but the same document says Google adjusted the boundary of its carbon reduction and net zero ambitions in 2025, excluding some Scope 3 activities “peripheral to our core operations” or where its influence is limited, and now uses the term “ambition-based” for the emissions the goal covers. Companies that kept their dates have still moved their goalposts, in the boundary rather than the year.
The competition
Put the four public commitments side by side and the differences are in three places: the date, the boundary and the interim milestones.
| Company | Stated goal | Status on 2026-11-24 |
|---|---|---|
| Meta | Net zero across value chain by 2030 | Timeline under review, no replacement date |
| Microsoft | Carbon negative by 2030 | Goal still listed, unchanged |
| Net zero across operations and value chain by 2030 | Date kept, boundary narrowed in 2025 | |
| Amazon | Net zero by 2040 (The Climate Pledge) | Goal still listed, unchanged |
The Microsoft and Amazon rows come from each company’s own sustainability pages; the Google boundary change comes from its 2025 environmental report. The table makes one point: of the four, Meta is the one that has moved its date, but it is not the only one changing how the target is calculated. For anyone judging a corporate climate pledge, the year is only the first column; the boundary and the interim milestones decide whether the pledge can be checked at all.
Our take
For developers and infrastructure teams, the practical reading is three things, none of them about the slogan.
First, no date means no checkpoint. Meta kept the 42% Scope 1 and Scope 2 target, the Scope 3 no-growth target and the SBTi-validated language, but net zero itself no longer has a deadline. For procurement and finance teams, the question to put to any supplier is which year, on what boundary and verified by whom, rather than whether a commitment exists.
Second, the doubling comes from capital goods, not from the buildings’ own power. The 8.73 million tonnes in Category 2 is servers, construction materials and equipment; data center Scope 1 and Scope 2 are 19,073 tonnes. That split decides where abatement can work: efficiency retrofits and clean power contracts do nothing for the manufacturing stage, which is exactly where AI expansion concentrates.
Third, the basis changes more easily than the conclusion. One year can be +45%, +39%, or a “12 times” figure that does not appear in the source data. Any document that quotes these numbers should say whether it means market-based or location-based, and whether instruments and credits are included.
The limits of this account: we read “dropped” as the deadline being removed while the goal language stays, a judgment based on two passages of the report that contradict each other, and Meta has not said which one governs. Whether the SBTi revisits a validation the company still cites is unknown. And the report never defines the “near-term intensity targets” it says are under review.
What to watch
Four things are checkable from here: when the review Meta promised actually lands, and whether it carries a new year; whether the SBTi says anything about a target the report still claims; whether the 2030 water positive goal follows the climate timeline into review, which the report does not suggest today; and what Hyperion emits and buys once it comes online in 2030. Among peers, watch whether Google’s boundary change continues into its next report, and whether Microsoft and Amazon hold the dates they still publish.